“pre qualification guide”

Yireh Painting Inc

PRE QUALIFICATION

Guide Book 

 

Index

Cover Page

1

Index Page

2

Company Profile

3

Preface

4-5

Our Target & Fulfilment

6

Reason of Our Success (Building Box)

7-10

Our Add Value Management

11

Our Inbound Vs Outbound Logistic Management

12

Our Vertical Management Integration

13

Specialty Work is another Addition & Customer Care Guarantee

13

Cuѕtоmеr Cоnfіdеnсе Guаrаntее / Commercial Painting

14

Commercial & Industrial / Residential Painting

15

Pre Qualification Form

16-17

Disclaimer

18

List Of Projects Successfully Completed in Last 5-Years

19

Work Place SHE fulfilment

20

We Trained Our Staff Appropriate Lifting Techniques

21

Accident Report Flow Chart

22

Our SHE safeguard

23-24

Our Job Planning

25-26

Role of Staffs

27

Our Quality Control System

28

Job Site Cleaning

29

Environmental Protection Act of Ontario

30

Bank Reference Letter

31

Our Project Budget & Finance

32

Our Best Services

33

Our Qualification Scoring System

34

Confirmation of our Litigation Statement

35

 

Company Profile:

 

Owner

Account's Manager

   

Project Manager

Purchase / Sales Manager

Office Super

            

 Estimator

 Project Coordinator

Quality Control Manager

   

Site Supervisor

SHE Inspector/ Trainer

   

Site Foreman

On Site Painters

 

Preface

 

Ø  Ethics of This Pre Qualification Guide is to provide a clear view to all of General Contractor, Owner, Builder, & Project Manager about our establishment and quality of work with sincerity of completing job in time without compromising the quality of work

Ø  Our Pre Qualification Guide is a explain about our establishment, Work Culture, Quality control and how serious we are about each and every job. This manual contains all list of work done as well as gives a guarantee of completion of job within the schedule time .

Ø  This Pre Qualification Guide is a Class-A performance detail about our activities including but not limited to Quality of work, Work Ethics, Maintain Schedule of work, Follow SHE, keep site clean to all of our General Contractor, Owner, Builder, & Project Manager.

Ø  During preparation of this guide we maintain our accurate facts, which provides a solid confirmation about our establishment and work culture .

Ø  This Guide explains our company profile including our expertise starting from Bidding to Completion of each and every job. .

Ø  We are not only serious about maintain our company profile, we are very enthuastic, serious about pricing the job, experts Admin consists of Market research personnel including team of expert Painters.

Ø  Our Pre Qualification Guide convey the essential requirements required by the General Contractor, Owner, Builder, & Project Manager during submission of Bids.

Ø  Our Pre Qualification Guide truly express that we are not only serious about getting the job, rather we are more serious about doing the job with all serious issues like maintain SHE, Quality as per spec, strictly follow schedule without compromising Quality and keep clean site day to day to make our client happy untill finish of each job.

Ø  The principle of this Guide is to a solid information about our establishment including expertise during selection of Bid process to our all General Contractor, Owner, Builder, & Project Mana.

Continuation of Preface

 

Ø  Our Pre Qualification Guide contains our score ratings of our success including but not limited to expertise of different items and all other research work beside just doing the jobs.

Ø  Our Technical personnel backed up with all latest modules of pricing in order to provide the accurate pricing each and every job based on the specification and requirements. These personnel very carefully checks all specs and drawing in details before they start pricing.

Ø  Our Technical personnel are backed up by Coordinator who collects all suppliers information and gets the best price in order to place a competitive price in each and every job looking the full requirement as per spec and design.

Ø  Our administration personnel are keen and dedicated to provide best support to our technical team during preparation of Bid, so that each bid should be accurately submit their best price in order to support our all General Contractor, Owner, Builder, & Project Manager

Ø  Our administration personnel are keen and dedicated not only to provide Pre Work Support to our Technical Staffs they also provide Post Work Support to our all General Contractor, Owner, Builder, & Project Manager

Ø  Our main goal is to Price-Get Jobs-Do the Job Right-Maintain SHE, keep site clean-Workers Health Issue-follow schedule-Quality Control-Attend Periodical Meeting at site--Follow all instruction given by Project Manger and keep very Good Relation with our all Clients making them happy and satisfied by successfully completing the job as per requirements.

Ø  Building Long term Trust with our clients is our main foundation of success, and we ensure to main throughout our business.

.

Our Targets of Fulfillment Items:

Ø  We offer Our Best Practice and Excellent Expertise through From Pricing to Completion of Job Including Post Work support

Ø  We submit the Certificate of Insurance, in favour of owner, Builder & General Contractor - as this is required during the job execution.

Ø  Our Object to Produce Bank reference ASAP as soon we receive Letter of content

Ø  Our Object to produce WSIB Clearance Certificate as and once needed by the project - and follow up with updates time to time for the simplest interest of the project

Ø  Our object is to Train Periodically our staff and update their licences during the execution of their work .

Ø  Our object is to maintain SHE issue during the progress of work. Also we inspect our workers at site periodically to make sure they are serious and maintaining SHE issue.

Ø  Our object is to use a same quality of all Material as they are in specs , and approved by the Owner, Builder, General Contractor & Project Manager for each and every job.

Ø  We instructed and involve our trades people not to clean any of their supply items at site- as this is restricted by Law.

Ø  Our main Target is to keep our client safe and satisfied with our work.

Our Main Building Box of Success

 

Our Expertise:

ü  We are working and skilled Since 2007, giving the best finish fulfillment with a post work follow-up help.

ü  Our Management and every single other staff are experienced and qualified having long time involvement with all extraordinary task we have finished until date

ü  Our painters have least 3-5 yrs involvement with Painting, Construction Safety and Hazards arrangement and keep up the spotless development condition

ü  Our Staffs dependably keep up the great association with the Project Manager and every single other staff of the Project Authority

ü  Our site specialists including site Supervisors get ready and keep up the wellbeing reports - as required by the Project Authority

ü  Our Supervisor are experienced and assumes the liability to go to the periodical site meeting - and do catch up all fundamental activity, as they ought to be taken at our end - went down by the workplace Administration

ü  Our site laborers exceed expectations in correspondence at site with different exchanges experts, and Project Site Management group everyday premise

ü  Our site laborers are genuine to check extend plan - everyday premise prior and then afterward the work every day

ü  Our laborers have a decent learning of materials acquisition in amount and quality, and book the lift heretofore they get occupied at site - move down by the workplace organization.

Our Expertise:

ü  Our Workers are intense about conveying all their essential licenses at site amid working hours - as expressed by the Project Authority or potentially required by the Local Administration.

ü  Our Workers are prepared and keep up the no smoking region - Project Authority or potentially required by the Local Administration.

ü  Workers are prepared and keep up the break time, as they are designated by the Project Authority - and investigate by our Site Supervisor consistently and get ready report for our own particular records for the best enthusiasm of the undertaking and our connection with Project Authority.

ü  We direct periodical meeting with our Site Supervisors - and affirm that all Projects Authority(s) necessities are met on time, trailed by the input to the Project Authority to ensure they are fulfilled, and that all employments are done legitimately as point by point.

ü  Our Administration staffs work genuinely and ensures that all our site laborers are protected at site and they are keeping the great connection with every single other Trade and with all Project Management colleagues.

ü  Our Quality Control staffs plans and checks all materials quality before they conveyed to the activity site to guarantee that meets the task prerequisite level.

ü  We prepared our site specialists and all office staffs to determine any issues emerge on or off locales with a shared exchange and took after by getting ready report and keep up through the work procedure.

ü  We not just deal with our laborers identified with site work, we additionally remain educated about our specialist’s individual wellbeing, and emotional well-being issues, alongside offering help with help in any capacity they may require.

ü  Our office Administration dependably watches out for request and supply issue of the progressing venture before they are late.

Our Expertise:

ü  Discontinued objects - Our office and dedicated staffs are exceptionally dependable to get any things which may be ceased soon - and store them in appropriate way as expressed or coordinated by the producer or provider with an earlier data and consent of the Project Authority

ü  Emergency/Urgent work - We bolster our task Authority with any critical work as and when required by the undertaking Authority

ü  Site Care - We generally cover the range we work and clean after work, and every one of our laborers are prepared by our approach so they generally keep up the site decent and clean

ü  Storing of our supply things Our laborers are prepared with the area where and how to store their supply material after the guideline of assigned region given by the Project Authority

ü  Conflict Resolution - Our laborers are prepared, and we keep up periodical gatherings on the best way to determine any contention at site for the best enthusiasm of the Project they are filling in and in addition our organization intrigue

ü  Holiday work consent - We educated and gather composed authorization for the Project Authority, if any occasion work to be proceeded if there should be an occurrence of criticalness - move down and took after by our office Administration and specialized staffs

ü  Overtime Hours work - We educated and gather composed authorization from Project Authority - before start additional time hour work if there should be an occurrence of desperation of work routine

ü  Our experienced Technical staffs continually dealing with setting up every Different Chart and Schedules as required by the site laborers so as to keep solid advance of the work for the best enthusiasm of the task

ü  Our Technical staffs are especially genuine and deals with all progressions made by the Designer as well as by the Architect - with a subsequent reports on the off chance that it is Additional Cost or No Cost for both our future records

 

Our Expertise:

ü  Our group of specialists regard their dispensed activity, therefore we finish every single activity - up as per the general inclination of Owner-Builder-General Contractor-Project Manager. We have faith in rehash customer., for the best enthusiasm of our organization

ü  Our experienced Technical Staffs acknowledges every troublesome activity, and go up against the specialized offering process for the task's fulfillment on time. They circumspectly get ready and keep up every extraordinary calendar so the activity can be finished effectively

ü  Our Coordinator also plays the key role by keeping close fraction with all suppliers, Shippers & all other information of latest technology advancement which are available and applicable

ü  Our Own Safety Inspection is the key control of our SHE issue

OUR - ADD VALUE MANAGEMENT:

 

ü  We are focused on all different values of work with a different ,manner. With the help of our coordinators continuously and deeply we do all research and analyze market value of our trade. Significantly we find all problems and do solve beforehand they appear. This is one of the other steps which keeps moving our goal ahead.

ü  Our market research team analyze and collects all latest competitive prices in order to support and control our price competitive without negotiation the quality of work.

ü  Our Quality control expert constantly working on different suppliers latest products Vs price guarantee for a specific job and they do this for each and every job in order to keep maintain the quality of work as specified

ü  Our admin team are very enthusiastic and expert in Multi Tasking job- so we can keep our competition low among the others

ü  Our Experienced Painters are able to do the same job in minimum time including maintaining the quality of workmanship, so that our production Vs Cost ratio is very competitive among others

ü  Our project Management team updating and using all latest technology- so that our overall target and effort can make a great success including satisfying our all clients

ü  On the whole goal of our Value Add Management is to deliver highest value for the smallest amount possible total cost and create an economical gain

OUR- INBOUND Vs OUTBOUND LOGISTIC MANAGEMENT:

 

  • Our Inbound logistic Management is a team regulated by the coordinators. In this process they quantify the materials and prepare the schedule of delivery, specify the location of delivery and pre arrange the storage location of each and every job. Besides that they cross check the quality of items before and after delivery with our quality control experts. Inbound logistic controls all tools and materials that out company orders from all different suppliers. They are liable to control and maintain records for reconciliation.

 

  • Our Outbound logistic Management is a team regulated by the same coordinators as above-but they take care of martial quantities as pre specified by inbound logistic and make sure they need to be shipped at job location on a specific date and time, as most of the time hoists are pre scheduled by the project managers. Our team make sure that time is always match with our outbound schedule. Out bound logistic also maintain their records to cross check with Inbound logistic and prepare final record of reconciliation to the accounts for audit.

 

This Logistic Management Tool helps, in progress of work and completing the jobs successfully as per schedule

BUDGET AND FINANCE 

  • Our Technical Team with the help of Accounts and Administration fine tuning, we are successfully budgeting each and every job keeping all marketing cost low. As a result we are able to track, compare and updated our records. As a result we use it as our future resource.

Our Vertical Management Integration

  • Our Vertical Management Integration maintain a process to acquire tools and materials from all different suppliers which produce a competitive cost advantage. A fully integrated supply chain compiling both inbound and outbound logistic with an automated ordering system and following up with pre scheduled reminder and sync with Managers & Coordinators cut down the recurring overall cost. This system helps to lower the cost and be in the front line in competition.

Specialty Work is another Addition

  • Yireh Painting Inc continuously adding new items in the list of work. Besides our experties in High Rise and all other Pаіntіng аnd Wallcovering & rеѕtоrаtіоn work. We added new values in our experince list like Faux Finish-Stain work- Metalic and Venetian Plaster, Scruff Master Painting for High Traffic Area. We constantly thriving to add new items which Comes in the market to provide best service to our clients. Our coordinators and researchers are constantly putting their best efforts to collect all new technology and set up a team of painters to train them with all these new items.

 Cuѕtоmеr Cоnfіdеnсе Guаrаntее

  • Our focus оn quality аnd оur attention tо your ѕсhеdulе gives уоu соnfіdеnсе іn оur ability tо gеt the jоb dоnе. Learn more about Yireh Painting Inc and our Cuѕtоmеr Cоnfіdеnсе Guarantee:
  • Our knоwlеdgеаblе Technical people mееt read through all Specification and Addendums including Change Notice before they go to check the drawings (Blue Prints) available tо do entire work starting from the stage "Pre Work To Post Work" of each and every рrоjесt.

 Cuѕtоmеr Cоnfіdеnсе Guаrаntее

  • A рrороѕаl will be ѕubmіttеd lіѕtіng the ѕсоре of wоrk required to complete уоur project іnсludіng a step-by-step explanation оf whаt is tо be dоnе, рrороѕеd mаtеrіаlѕ, соѕt to реrfоrm the work, timeframe іn whісh thе wоrk wіll bе done, аnd a warranty.
  • Wе always uѕе the ԛuаlіtу product as spec in each and individual job, and hіghlу experienced professionals who аrе passionate аbоut рrоvіdіng thе mоѕt hеlрful аnd соnvеnіеnt ѕеrvісе. Yireh Painting Inc іѕ fully lісеnѕеd аnd іnѕurеd and Wе рrіdе оurѕеlvеѕ оn being lоуаl, honest and hardworking, we trulу love what wе dо аnd іt ѕhоwѕ іn оur wоrk. Wе іnvеѕt a lоt оf time аnd energy іn kееріng uр wіth thе mоѕt еffесtіvе tесhnіԛuеѕ. Rеѕt аѕѕurеd thаt the Yireh Painting Inc team pays сlоѕе аttеntіоn tо detail аnd will соntіnuе to mаіntаіn a ѕuреrіоr ѕеrvісе and аn unmаtсhеd соmmіtmеnt tо еxсеllеnсе.

Commercial Painting

  • Yireh Painting Inc bring years оf experience in the соmmеrсіаl раіntіng industry. We wоrk wіth ѕоmе of thе lаrgеѕt property mаnаgеmеnt соmраnіеѕ іn the аrеа аnd аrе wеll known аnd regarded for our раіnt mаіntеnаnсе рrоgrаmѕ.
  • Whether you need іntеrіоr раіntіng for your соmmеrсіаl ѕрасе оr hеlр wіth dеѕіgnіng аnd іmрlеmеntіng your соmmеrсіаl еxtеrіоr раіntіng jоb, Yireh Painting Inc has thе experience, trаіnеd professional ѕtаff, and ѕtаtе-оf-thе аrt еԛuірmеnt to gеt уоur рrоjесt соmрlеtеd efficiently, аnd lеаvе уоu wіth a bеаutіful end result.
  • We offer bоth interior painting ѕеrvісеѕ аnd еxtеrіоr painting ѕеrvісеѕ fоr your buildings, thаt іѕ whу Yireh Painting Inc wіll аѕѕіgn professsionals tо your jоb tо mаkе ѕurе thаt уоur рrоjесt рlаn іѕ completed at a ѕtеаdу pace аnd that уоu ѕtау іnfоrmеd wіth аnу dеtаіlѕ аbоut your rеѕіdеntіаl раіntіng рrоjесt

Commercial & Industrial Painting

  • Yireh Painting Inc оffеrѕ a wіdе variety of іnduѕtrіаl ѕеrvісеѕ tо рrеvеnt оr correct ѕаfеtу соnсеrnѕ аѕ thеу arise. Cоnсrеtе crack rераіr аnd expansion jоіnt rеfurbіѕhіng аrе еѕѕеntіаl tо mаіntаіnіng your fасіlіtу. Our flооrіng еxреrtѕ hаvе уеаrѕ of еxреrіеnсе in аddrеѕѕіng thеѕе іѕѕuеѕ аnd оffеrіng multірlе орtіоnѕ to fіx thе problems.
  • Aftеr mоrе thаn some уеаrѕ of еxреrіеnсе іn industrial раіntіng, wе'vе ѕееn and hаndlеd juѕt аbоut аnу іnduѕtrіаl mаіntеnаnсе ѕіtuаtіоn. Our staff has decades оf еxреrtіѕе mееtіng ѕаfеtу аnd іnduѕtrу rеgulаtіоnѕ.
  • Wе also саn kеер уоur fасіlіtу сlеаn and ѕаfе wіth оur maintenance programs fоr сеіlіngѕ, wаllѕ, and flооrѕ. Yireh Painting Inc uses specialty соаtіngѕ dеѕіgnеd for hоѕріtаlѕ, fооd mаnufасturеrѕ, аnd mаnу оthеr іnduѕtrіеѕ.
  • Keep уоur рlасе looking nеw bу utilizing our еlесtrоѕtаtіс раіntіng services оn уоur machinery, conveyors, аnd lockers. Prоlоng the life оf уоur storage bіnѕ аnd tаnkѕ wіth оur exclusive 10 уеаr wаrrаntу аgаіnѕt соаtіng fаіlurе

Residential Painting

  • Yireh Painting Inc аrе the best rеѕіdеntіаl painting соmраnу that has bееn providing its ѕеrvісеѕ fоr over a quarter сеnturу. Bеіng a lеаdіng Painting соntrасtоr іn thе іnduѕtrу, Yireh Painting Inc thrіvеѕ, bесаuѕе of іtѕ dedication to quality wоrkmаnѕhір, fіvе-ѕtаr ѕеrvісе and reasonable рrісеѕ.
  • Wе offer іntеrіоr аnd еxtеrіоr раіntіng ѕеrvісеѕ fоr rеѕіdеntіаl buіldіngѕ. Frее оf сhаrgе, wе wіll dо аn estimate for уоur residential раіntіng jоb. All оur раіntіng рrоjесtѕ аrе executed раіnѕtаkіnglу. Wе ѕtаrt аnd finish аll painting projects оn tіmе. Wе pay соmрlеtе аttеntіоn tо dеtаіlѕ аnd mоѕt іmроrtаntlу wе mаіntаіn a nеаt, clean wоrk еnvіrоnmеnt whіlѕt dоіng thе jоb and whеn we аrе dоnе.

Pre Qualification Form

  1. Yireh Painting Inc-Company Information:

 

Company Name

Yireh Painting Inc

Street Address

7161 Yonge St

City, Province

Thornhill, On

Postal Code

L1H 6N6

Phone Number

416-888-1177

Fax Number

.

Contact Person

Jeny Rodriguez

Title / Position

Owner

Email

This email address is being protected from spambots. You need JavaScript enabled to view it.

 

Reference of some Contact information

 

B.  Reference:-1

Company Name

Cresford

Company Address

170 Merton St. Toronto. On.M4S 1A1

Contact Name

Brandon Underhill (Casa-3)

Contact Phone

(+1) 416 526 7167

Contact Email

This email address is being protected from spambots. You need JavaScript enabled to view it.

Reference:-2

Company Name

Tucker High Rise

Company Address

3755 Victoria Park Ave. Toronto. On. M1W 3Z4

Contact Name

Kim McClory (Pace Condo)

Contact Phone

647 534 3079

Contact Email

This email address is being protected from spambots. You need JavaScript enabled to view it.

Reference:-3

Company Name

Remington

Company Address

7501 Keele St. Suite-100. Vaughan. On. L4K 1Y2

Contact Name

Brent McKee (Marriott J & K Building)

Contact Phone

647 963 0532

Contact Email

This email address is being protected from spambots. You need JavaScript enabled to view it.

 

  1. C) Financial Information:

 

Annual Value of Work

1.10 Million (Ave)

Job Insurance

Attached sample copy of current Job Insurance

Job Bond

We submitted during contract

Disclaimer:-

 

Ø  More Jobs which are Successfully Completed in last 5 Years attached in the following page for your ready reference.

Ø  With our full conscious stating that - above all information are True and we do not

eList of all Jobs Successfully Completed in the last 5 years 

Sl No

Project Title

Builder

Status

1

Casa-III

Cresford

Completed

2

Marriott -K

Remington

Completed

3

J Marriott -J

Remington

Completed

3

3018 Yonge

Lanterra

Completed

5

Pace Condo

Great Gulf

Completed

6

Hullmark

Tridel

Completed

7

Fountain

Liberty

Completed

8

Liberty Hotel

Liberty

Completed

9

Ventus

Tridel

Completed

10

Renaissance

Tridel

Completed

11

London West

Citizen

Completed

 

Work Place SHE Compliance:

 Our Staff Trained to follow the Safety Of Lifting (Part of our Training)

 

University of St. Andrews

  1. We Trained Our Staff Appropriate Lifting Techniques :

Lifting of any items at site is a major point to be safe from any injury. Any odd lifting may cause Vital - fatal injuries to any of worker at site.

Here are the steps you learned during your Tainting session, follow these steps - make sure all worker at site maintain all the time at any cost:

  1. Plan Ahead
  2. Plan how far to go
  3. Lift one item at a time
  4. Do not carry on shoulder
  5. Try to Push in lieu of Pulling
  6. Use hand cart / Pump Truck
  7. Ask help if item is heavy for you
  8. Make sure you are not dehydrated
  9. No smoking before and after carrying load
  10. Try not to reach above your shoulder height
  11. Take break as, and when needed during lifting
  12. Help others if your co workers need to lift item
  13. Take enough hydrating fluids after carrying load
  14. Ware Waist belt to have a support before you lift
  15. On the way to carry load take small steps (Instead of long steps)
  16. Make sure your path is clear (without having any object in your path of travel)
  17. Face the load -> Back Straight -> Knees bent -> Head Up -> Feet & shoulder width apart -> Load Close -> No Craning

 

Incident Report Flow Chart

Worker / Co- Worker

Yireh Painting Foreman

       

Builder's Project Manager

 Yireh Painting Job Supervisor

Office Manager

       

HR Manager

Project Coordinator

WSIB(If Required)

       

 Confirmation From WSIB- Project Coordinator

Company Account's Manager

       

 Confirm Back To Worker

 Owner Of Yireh Painting

 

Our SHE Safeguard Issue:

 

 

  1. EYE Protection:

1a) Our Workers use Eye Glass, Half Face Mask / Full Face Mask - as and when it is required by law,

as well as for the safety of their health

1b) Change Eye glass shield periodically, as and when it is required - so that they are able to see clearly

  1. lung Protection:

2a) Do not inhale or try to whiff any material at site

2b) Keep open of all nearest ventilation during working- unless it is prohibited by the Project Authority

2c) Always use dust mask when Sanding / Painting, and use Face Mask when spraying 2d) Clean and Wash your Hand and Face (including eyes & nose) after work

3e) Clean face before using any mask - in order to fit well with the contour of the face

  1. Skin Protection:

3a) Wear Coverall (with or without hood), as and when it is required to keep safety of their health

3b) Wear Gloves (Size and Quality as they trained during safety training)

3c) Wear Hard Hat (Quality as recommended by law) ,and as trained during safety training

3d) Wear safety Boot (Quality as recommended by CSA) ,and as trained during safety training

NOTE: We have Our own "Health & Safety Disclaimer"

 

Continuation of Our SHE Safeguard Issue:

  1. FALL Protection:

 

4.1.  Erection of Ladder during work:

4.1.a) We keep clean all the nearby area where ladder is to be erected 4.1.b) Our Workers make sure that floor is properly level before Erection

4.1.c) Make sure that all 4- Legs are stable and no movement of ladder before climb 4.1.d) Make sure All Step are clean and free from any slippery items

4.1.e) If using ladder nearby any close door -make sure door is properly close with a caution sign - so one can open- without alerting

4.1.e) When the ladders are placed in the middle of a passage-must provide the Caution Sign in both side of ladder

4.1.f)  After completion of work keep ladder clean and move in safe place after folding

4.2.  Check Step Ladder:

4.2.a  We replace the ladder immediate after checking that they are not safe to use

4.2.b  ) We use construction grade ladder 4.2.c) We clean ladders periodically

4.2.c)  We move ladder in safe place after work

4.2.d)  We check and confirm , that all parts and screws are tight and safe to use 4.2.e) We do not use laddering in any slippery floor- without taking any precautions 4.2.f) Workers use Safety Harness as required if they reach certain height

4.3.  Climbing Ladder during work:

4.3.a) Our Worker do not use any footwear other than - Safety Boot 4.3.b) Any boot/ shoe other than Safety Boot is not allowed at site 4.3.c) Worker do not use the last step of the ladder in any case

4.3.d) Anybody other than our worker-is not allowed to use ladder at site unless, permitted by a responsible person at site

JOB PLANNING

` Plan Ahead:

Ø  We starts each Job planning individually as soon we received the contract.

Ø  We confirm our Trade start date and check the complete schedule step by step

Ø  Prepare complete planning from start to end, and divide that plan into two phases

1) Pre Work Phase 2) Post Work Phase:

Pre Work Phase :

Ø  We held meeting with our Staffs and Managers to fix the team, who will take care of the job from stapes by stapes

Ø  We check all our schedules and prepare our plan ahead chart

Ø  Our technical staffs check all change notice and updates immediately, and if any issue need to be solve, they contact ASAP

Ø  We contact our all suppliers and confirm them in order to get prepare and make their own plan ahead of time, with our complete step by stem requirements

Ø  Our Tech Team prepares all necessary charts and confirm those with spec and drawings

Ø  Before starting the job we make sure all sample are approved form the authpority

Ø  We communicate total plan with our site staff, and provide them all back up supports as and when requires

Ø  One of our In charge attuned all periodical site meeting and update all point as required by the authority

Post Work Phase:

 

Ø  We prepare all documents and save those in proper way, so that we can provide all necessary support to our all client as and when they need those

Ø  We provide these support even the jobs are completed long before, so that clients are always happy and satisfied

Ø  We always keep happy our clients with warranty period work to avoid any issue with our clients

Role Of Staffs:-

 

Front Desk (Check Job Scopes)

Office Coordinator (Rcvd Job Interested)

 

Technical Staffs (Check Spec & Prepare Lists)

PM

 Estimators (Starts QE)

 

HR Manager (Collects Infos as Rqrd)

Project Coordinator (Helps to collect all necessary info as rqrd)

 PM (Confirms Spec & Price)

 

 Office Manager (Prepare files ready)

 Company Account's Manager (Rcvd A copy of Job Price and save for communication)

 

Front Desk (Get ready to send on time)

 Owner Of Yireh Painting (Final Check before send and confirms)

Our Quality Control Programme:

  

  1. Procedure:

1.1) We check all Spec and Drawings and confirm and make list of materials as required 1.2) We check and confirm all Quality of material & make sample after approval

1.3) We checks all items as soon as it deliver at site before use 1.4) Any issues we confirm systematically and communicate ASAP

2).  Materials collection:

2.1)  Following our schedule, our technical team purchase materials step by step as it was plan before after receiving the contract

2.2)  Our Site Foreman, Supervisor even site staff checks all items quality after delivery 2.3) Changes of any material - we send to the Project Authority for Re-approval

  1. 4) After confirmation of quality of material, only get approval to use at site

3)  Materials Storage:

3.1)   We make sure storage at site is safe and commercially controlled storage as specified by the Authority.

3.2)  We every so often check our storage conditions, confirm they in good condition

3.3)  Any changes of location-we confirm with the Authority

3.4)  We check all items are properly stacked and easy accessible

3.5)  We do not keep any surplus items at site, remove them ASAP job is don

6 ) We keep clean site and storage all time, and dump any of our garbage at specified location

  1. Job site cleaning:

  

1.1)   We keep clean site and storage all time, and dump any of our garbage at specified

location

1.2)  Our worker do not smoke at site unless

1.3)   We keep clean our storage and the specific room allowed to use for our trades staffs for breakfast and lunch, and clean after use

1.4)   Our worker takes out all our garbage time to time and dump those as specified by the authority

1.5)  Our site staffs do not dirt any surface they work

1.6)   We do not clean our sundries in any sink and tub during or after work is finished

WE DO NOT CLEAN OUR EQUIPMENT IN SINK/ BATH TUB ETC

AS IT IS AGAINST - BY LAW

PROTECTED BY

ENVIRONMENTAL PROTECTION ACT OF THE PROVINCE OF ONTARIO REGULATION ACT. 347

Our Project Budget & Finance Policy

 

Yireh Ptg Budget/Finance Planning

 Job Contract Cost

     

 Job Running Cost

 Yireh Painting Invest

 Finance from Bank

     

 

Finance from Other Resources

 Yireh Painting Credits

 Refund To Bank

     

 Refund to Other Resources)

 Percent Save for next Job

     

 Generation of new credits

 Yireh Painting Net Credits

 

Our Best Service as, and when required

Ø  We do "Sales Office" Painting " as and when required with complete satisfaction of the ownerØ  We serve best during our warranty period

Ø  We do Specialty work as listed before in previous pageØ  We attend urgent call and do our best to overcome with situation

Ø  We constantly do all new product and application research work in order to ahead

Ø  We "Post Work" support helps our client round the clock, and do our best

Our Qualification Scoring System:

 

Evaluated Items

Credentials

Score

Our Skill

10

10

Quality of Work

5

5

Quality Control

5

5

Experience in this Trade

5

5

Our On time Completion of each Job

5

5

Similar Projects/ Other Projects Completed

5

5

Our Health & Safety Issue

5

5

Human Resource Work

5

5

VOC/ LEED Issue maintain

5

5

Resources & Relation

5

5

Market Survey

5

4

Suppliers Relation

5

5

Site Cleaning

5

5

Reference

3

3

Garbage Dumping

5

5

Maintaining Protection of Ontario Environment Law

3

3

Litigation

5

5

Company Set Up

5

5

Addition of New items

5

3

Target orient, Development

4

4

Total Credential Vs Score :

100

98

Confirmation of our Litigation Statement :-

 

Ø  With our full conscious stating that - we do not have any legal issue with any clients since out day of starting to today